An owner planning to sell in 2027 still has time to fix most records problems. Once a letter of intent is signed, that time belongs to the buyer's timetable. The records are read during due diligence and again at the pre-purchase inspection, and each gap turns into a question, a delay or a price discussion.
This scorecard lets an owner and their maintenance manager run the same review first. It takes each part of the record set a buyer's technical adviser will ask for, and scores it on what can be produced today.
What the rules require you to keep
Start from what regulation already requires, because a buyer will expect at least that.
In the United States, 14 CFR 91.417 requires the registered owner or operator to keep the total time in service of the airframe and each engine, the current status of life-limited parts, the time since overhaul of items overhauled on a time basis, the current inspection status, the current status of applicable airworthiness directives with the method of compliance, and copies of the forms for each major alteration. Those records must be retained and transferred with the aircraft when it is sold (§ 91.417(a)(2) and (b)(2), eCFR, read 9 November 2026).
The same section lets records of individual maintenance work be discarded once the work is repeated or superseded, or one year after it was done (§ 91.417(b)(1)). A buyer's adviser will still ask for them.
In the EU, Regulation (EU) No 1321/2014, Annex I (Part-M), point M.A.305 sets out the aircraft continuing airworthiness record system: the current mass and balance report, and the current status of airworthiness directives, modifications and repairs, compliance with the maintenance programme, deferred defects, life-limited parts and time-controlled components. Point M.A.307 requires those records to be transferred when the aircraft is permanently transferred to another owner or operator. The lighter regime, Annex Vb (Part-ML), applies only to aircraft that are not complex motor-powered aircraft, such as aeroplanes of 2,730 kg maximum take-off mass or less. An aeroplane above 5,700 kg, certified for a minimum crew of two pilots, or equipped with turbojet engines is a complex motor-powered aircraft (Articles 2(u) and 3(2) of the Regulation, consolidated text of 7 August 2026), so most business jets fall under Part-M.
Other registries have their own rules. The regulatory minimum is a floor, and buyers usually ask for more.

The scorecard
Score each category 0, 1 or 2:
- 0: records missing or not yet located
- 1: records exist but are incomplete, not indexed or not reconciled
- 2: complete, current and ready to hand to a buyer's adviser
1. Logbook continuity
Airframe, engine and APU logbooks from new, in sequence. Any gap is identified and explained in writing, with the period it covers.
2. Current status summaries
Total time and cycles, inspection status, airworthiness directive status with the method of compliance, and life-limited parts status, each reconciled to the logbooks. These are the summaries 14 CFR 91.417(a)(2) and M.A.305(c) and (d) describe.
3. Modifications, repairs and damage history
Approved data and release documents for every modification and repair. A written account of any damage, with the repair documentation behind it.
4. Engine and APU programme position
Enrolment status for each engine and the APU, what each programme covers, and the documents a buyer needs to confirm the position directly with the programme provider.
5. Component traceability
Release certificates, for example FAA Form 8130-3 or EASA Form 1, for installed life-limited parts and major components, and the in-service history behind each life-limited part.

6. Maintenance due in the next 24 months
Inspections, programme events and life limits that fall due within the buyer's first two years, with the source of each due date.
7. Format and access
Scans indexed by document type and date, an export from the maintenance-tracking system, and the location of the original documents.
Reading the score
The maximum is 14. The total matters less than where the zeros are. A 0 in logbook continuity, status summaries or component traceability is hard for a buyer's adviser to work around, because they show whether the airworthiness status of the aircraft can be demonstrated.
Fixing a 0 usually depends on other people: previous operators, maintenance facilities and parts suppliers, each with its own response time. Starting the requests in late 2026 leaves room for them before a 2027 listing.
What to do with the result
- give the scored sheet to the maintenance manager or continuing airworthiness organisation
- list every 0 and 1 with a named owner and a target date
- decide which known gaps to disclose at listing, with the explanation already written
For how records affect liquidity, see The documentation premium. For the buyer's side of the same question, see the records section of The acquisition brief before the search.
Score your records before a buyer does
If you plan to sell in 2027, Glintero can run the scorecard with your maintenance team and show you what a buyer's adviser is likely to ask. Every conversation is confidential. Talk to Glintero about records readiness.


